PROOF / DEPLOYMENTS IN MOTION

Same platform. Four physical formats in motion.

Active developments and pipeline across the Fullscale operating model. Status labels, not dates. What's live, what's structuring, what's in delivery.

◉ FLAGSHIP · IN DEVELOPMENT

Flagship Campus

Eastern US · BTM bridge · Grid interconnect filed

The launch campus. Demonstrates the full operating model — behind-the-meter generation bridges first power, utility interconnect proceeds in parallel, the modular block farm scales without rebuild, and white-space turnover hands the inside back to the customer.

Status
In development · First capacity sequenced
Format
Single-site campus
Power
BTM bridge + grid filed
DISTRIBUTED · IN STRUCTURING

Regional Inference Network

Multi-state · 4 sites · Federated

A distributed inference deployment across four metro regions. Same MDC unit. Same operating handoff. Different fiber footprints, different utility relationships — same model: BTM bridge per site, grid in parallel.

Status
Structuring
Format
Distributed sites
Sites
4 metro regions
Power
BTM primary · grid as available per site
EDGE · IN DELIVERY

Sovereign Edge Nodes

Controlled access · Single-unit · Multi-site

Sub-megawatt nodes for a sovereign workload — single MDC unit per site, self-contained BTM power, controlled environment. The platform deployed in formats people assume require a different vendor.

Status
In delivery
Format
Edge nodes
Hardware
Customer-supplied
Power
Self-contained BTM
PIPELINE / EVALUATING

Additional sites under evaluation across multiple US regions.

Sites in Pennsylvania, Texas, South Carolina, Virginia, and beyond — selected for power availability, fiber connectivity, and community fit per the Fullscale site selection methodology. The platform is built for replication. Every additional site is faster, cheaper, and lower-risk than the last.

PA
EVALUATING
TX
EVALUATING
SC
EVALUATING
VA
EVALUATING
+
MORE
CAPACITY OPEN

Capacity, structured around you.

Want a fit assessment against the current pipeline? One inquiry. Three selectors. Response within 24 hours.

Submit capacity inquiry